A commissioning plan is a document used to outline the scope and define the responsibilities of the commissioning process as well as the activites, schedules and documentation required. According to BSRIA Guide BG 8/2009 Model Commissioning Plan, the plan should: Provide general information about the project.

What is the purpose of a commissioning plan?

The general purpose of a commissioning plan is to give direction for the entire construction process. It basically acts as a road map for entire construction team.

What is the role of a commissioning agent?

A commissioning agent works closely with lead contractors to ensure that a building or construction project meets the operational requirements of the client. As a commissioning agent, your job duties involve overseeing the design, installation, testing, and maintenance of all components, materials, and systems.

What is the commissioning process?

The commissioning process is the integrated application of a set of engineering techniques and procedures to check, inspect, and test every operational component of the project—from individual functions such as instruments and equipment, up to more complex entities such as subsystems and systems.

Why do we need commissioning?

Extend building’s lifespan – Proper commissioning ensures your facilities roofing, wall, and pavement systems continually operate according to specifications. Extending the lifespan not only guards the conditions of your facilities, but also minimizes risk to the people, products, and equipment inside.

What is a commissioning protocol?

Commissioning Protocol means the protocol confirming that the EMIS components have been fully installed in accordance with all applicable laws and regulations, signed by the relevant Contractors and the technical supervisor of the Recipient and certified by the relevant Government Authorities, as applicable.

What are the four major phases of a commissioning process?

Mission Critical / Data Center Commissioning Phases

  • Phase 1: Pre-Design.
  • Phase 2: Design.
  • Phase 3: Construction.
  • Phase 4: Occupancy.
  • Phase 5: Post-Occupancy.

What should be included in a commissioning schedule?

A commissioning schedule is developed as a section of (or appendix to) a commissioning plan and is updated throughout the project. The objective of scheduling commissioning activities is to integrate and coordinate them with other planning, design and construction phase activities.

What are the objectives of the commissioning process?

The objective of scheduling commissioning activities is to integrate and coordinate them with other planning, design and construction phase activities. Detailed integration of commissioning activities and tasks with the overall project schedule is critical to maintaining project milestones.

What is the purpose of a commissioning plan / CX plan?

The purpose of a Commissioning Plan / Cx Plan is to clearly set out, to all parties, the Commissioning Process and Activities, Strategies, Sequences, Project Schedules, Documentation, and Responsibilities for a project from the outset. It will usually be created and maintained/updated by the Commissioning Provider/Authority [CxP/CxA].

How to develop the testing and commissioning plan?

How to Develop the Testing and Commissioning Plan 1 Step 1: Who Develops the Commissioning Plan? It is not really a big surprise who is responsible for writing and… 2 Step 2: Commissioning Plan Template Index The first thing to do is to format and layout the document to fully understand… 3 3a. Pre-Construction More